PROJECT MANAGEMENT

  • Sizing and Equipment Selection
  • Planning & Proposal Preparation
  • Project Management & Implementation
  • Transport & Logistics
  • On-Site Project Assistance
  • Start-Up Coordination
  • Installation & Plant Commissioning
  • Operations Support

our principles

  • Strong Client & Customer Focus
  • Highest Product Quality Standards
  • High-Grade Components & Materials
  • Excellence: "Good is not Good enough"
  • Proven System Procedures
  • Preventive Quality Assurance
  • Added Value & Economic Efficiency
  • Integrity & Professionalism

SUPPORTING PROJECT ENGINEERS & CONTRACTORS

Our customers are supported by experienced technical & commercial professionals who have years of experience in execution & project management. At 2G-CENERGY® a team of experts understand the importance of professional project management. We offer customers competent and dependable assistance during the project planning process. Successful implementations of CHP cogeneration technologies require a high level of expertise and experience. Our customers can stay focused on their core business while 2G-CENERGY® takes care of selecting the most adequate type of equipment and technology. We support the customers planning engineers, and their contractors.

We see beyond “business as usual”. It is nice to be good, but for us "good just isn’t good enough".
The nature of successfully implementing CHP technologies stands in contrast to business as usual. We are specialized in product development, design, engineering, manufacturing, supplying, installing and commissioning highly efficient CHP cogeneration plants. Completing these projects requires distinct technical skills and the adoption of specific project management know-how.

Thanks to our modular structure of standardized elements and components we can precisely adapt your plant to your operational requirements. Professional planning and proven technologies guarantee optimal operating processes.

PROJECT PROCESS

  • Our project engineering approach is different compared with most other suppliers. For us functionality and technical implementation is a given. Therefore we can concentrate on the real important issue. 2G-CENERGY's project approach is primarily ROI-oriented. Your return on investment is our main concern. We focus on issues emphasizing optimal plant efficiency, cost controls, and economical operation.

  • We develop project-specific plans for every individual plant, to get the job done on-time, within budget, and without any incident. Competence, experience, and an innovative corporate culture have made 2G-CENERGY one of the leading experts and providers of modular biogas cogeneration systems. 

  • Careful planning and preparation are fundamental prerequisites for smooth installation and rapid commissioning. Customers benefit from our in-depth knowledge, and our extensive CHP cogeneration experiences in virtually every sector of industry - a rare blend of expertise that will be of advantage to you.

COMPUTER AIDED DESIGN

All our plants are designed by a team of highly qualified factory engineers utilizing the latest CAD technologies. CAD is supporting our designers and project engineers to integrate all vital power plant components and to dramatically reduced the duration of the product design cycle.

Further, the integration of computer aided design and computer aided manufacturing greatly reduces the time required for production planning and allocation of jobs to various resources during the project. Additional plant process technology software is applied. Key benefit is that operational plant performance and efficiency can be simulated in advance to assure the highest possible level of CHP plant utilization and profitability.

ON-SITE PROJECT SUPPORT & PLANT COMMISSIONING

Testing & Installation

Plant commissioning is a critical part of the overall process of transforming the equipment from design, manufacturing and installation through to full operation. Our modern engineering and management processes have also redefined project execution standards. We execute major projects with high standards of performance and always focus on completing the project on scheduled time and within the pre-defined budget. Every plant manufactured and supplied by us is commissioned in three phases.

Phase 1 - Testing
All equipment, its functions, and ratings are tested under load at the factory, prior to shipment.

Phase 2 - Shipment
The equipment is shipped and securely delivered utilizing the most efficient means of transportation.

Phase 3 - Installation
At the job-site we assist with integrating the cogeneration CHP modules into the customers individual infrastructure. All equipment functions are inspected and tested again under local conditions and using the customers fuel source.

When it comes to power plant commissioning, our team gets very involved in assisting general contractors with there efforts, supervising final installation processes, system integration, on-site testing, etc. We also consult closely with the plant operating team, coaching new employees with on the job training, working as part of the initial power plant operations team, ensuring that all specs meet customer requirements and secure that the integrated systems perform to the owners satisfaction.

Optimization & Operation

Optional a service of supervisory and skilled on-site assistance is also available after plant installation, and turnkey responsibility is accepted. If required, our engineers can be made available to be present on site after the commissioning and start-up process to optimize operating conditions, to guarantee most efficient performance, and assisting to train plant operators.